arrow left arrow right

KIA Showroom

PROJECT OVERVIEW

JD Operations were contracted to design, manufacture, and install the extension to the car showroom. Over 800 tonnes of steel will be used in the construction of 10 floors, 7 of which will be underground.

The external envelope of the 3 floors above ground have also been tasked to JD Operations, with the major challenge being the installation of large format glass panes, and Alucobond works.

FACTS

  • 2018 due
  • Qormi location
  • 500 sqm of glass
  • 800 tonness of steel