arrow left arrow right

Joinwell

PROJECT OVERVIEW

JD Operations were exclusively responsible for the construction of the 3,000sqm department store and offices. Spread over 3 floors, this contemporary and sleek design has driven the contemporary design and construction industry in Malta.

Works involved the erection of the entire steel structure of the building – from base foundations to finished state, installation of a 10×10 tempered laminated glass for main façade, extensive internal steel works, aluminium apertures, erection of U-shaped glass for the tower, and steel cladding.

FACTS

  • 2008 completion year
  • Qormi location
  • 450 tonnes of steel
  • 500 sqm of glass